Duck Pond and Shorebird Pond have reached their full holding capacity and water is freely spilling over the spillways.
Goose Pond will begin spilling over in the next day or so. It is 3 inches shy of capacity.
Combined they hold approximately 30 million gallons of water and cover in excess of 35 acres of land.
The important thing to remember is that the there is no head pressure on the tile lines on all sides of the wetland. This means that the drainage tile can drain freely with out backing up.
The wetlands are functioning as designed.
I encourage everyone to look east as you drive by on County Road 17.
Friday, March 19, 2010
Thursday, March 18, 2010
Wednesday, March 17, 2010
Pictures of Basin A - Duck Pond
Tuesday, December 22, 2009
Project is 95% Complete.